According to Stadtwerke Görlitz, in connection with the revitalization of the water supply system, the construction works on Heilige-Grab-Straße will begin on Monday (04. 09. 2023). This causes a complete junction blockade with Zeppelinstraße.
This means that the access to the parking lot (for those who own a parking space in our car park, as well as for clinics patients and visitors) during construction works will only be possible from Heilige-Grab-Straße and not from Zeppelinstraße.
According to Stadtwerke, construction works will last from 4 September to 31 October.